3

5

Before fabrication or procurement

M3

Grooved end couplings

9.1.1

9.2.1

9.3.1

86-68420

(1) Commercial products data


(2) Details of pipe ends

0

3

5

Before fabrication or procurement

M4

Pressure gauges

9.1.1

9.2.1

9.2.2

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M5

Hydraulic dampened check valves

9.1.1

9.2.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M6

Manually operated butterfly valves

9.1.1

9.2.1

9.2.2

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M7

Motor operated butterfly valves

9.1.1

9.3.1

86-68420

(1) Commercial products data


(2) Test data


(3) Torque calculations


(4) Assembly drawings


(5) Schematic and wiring diagrams

0

3

5

Before fabrication or procurement

M8

Pressure-sustaining and check valves

9.1.1

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M9

Ball valves

9.1.1

9.2.1

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M10

Air valves

9.1.1

9.2.1

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M11

Elevated steel tanks

9.1.1

9.2.2

86-68420

(1) Shop drawings


(2) Design calculations


(3) Erection engineer qualifications

0

3

5

Before fabrication or procurement

M12

Safety rail

9.1.1

9.2.2

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M13

Metal piping for sectionalizing valve and farm unit irrigation installations

9.1.1

9.3.1

86-68420

Shop drawings for information only

0

3

1

Before fabrication or procurement

M14

Combination rate of of flow controller, pressure reducing, and pressure staining valves

9.1.1

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M15

Stop and drain valves

9.1.1

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M16

Curb stops

9.1.1

9.3.1

86-68420

Commercial products data

0

3

5

Before fabrication or procurement

M17

Traveling water screens

9.1.1

9.4.1

86-68410

(1) Commercial products data


(2) Calculations


(3) Drawings

0


0


0

3


3


3

5


5


5

Before fabrication or procurement

M18

Conveyors for traveling water screens

9.1.1

9.4.2

86-68410

(1) Commercial products data


(2) Calculations


(3) Drawings

0


0


0

3


3


3

5


5


5

Before fabrication or procurement

M19

Line meters

9.1.1

9.4.3

86-68410

Commercial products data

0

3

5

Before fabrication or procurement

M20

Vertical turbine pumping units

9.1.1

9.5.1

86-68420

(1) Commercial product data


(2) Drawings


(3) Test set up drawing

0

3

5

Before fabrication or procurement

M21

Vertical turbine pumping units

9.1.1

9.5.1

86-68420

Certified test data and reports

0

3

5

Before shipment

M22

Vertical turbine pumping units

9.1.1

9.5.1

86-68420

Installation manuals

0

3

5

Before shipment

M23

Vertical turbine pumping units

9.1.1

9.5.1

86-68420

Field alignment procedures

0

3

5

Before shipment

M24

Vertical turbine pumping units

9.1.1

9.5.1

86-68420

Millwright qualifications

0

3

1

Before shipment

M25

Vertical in-line screen spray pumping unit

9.1.1

9.5.2

86-68420

(1) Commercial product data


(2) Drawings

0

3

5

Before fabrication or procurement

M26

Vertical in-line screen spray pumping unit

9.1.1

9.5.2

86-68420

Certified test data and reports

0

3

5

Before shipment

M27

Oil storage tank

9.1.1

9.6.1

86-68420

(1) Commercial products data


(2) Drawings and data

0

3

5

Before fabrication or procurement

M28

Motor-operated slide gate

9.1.1

9.7.1

86-68420

(1) Commercial product data


(2) Drawings and data


(3) Motor Data

0

3

5

Before fabrication or procurement

M29

Ventilating systems

(Approval Data)

9.1.1

9.8.1

86-68410

(1) Commercial products data


(2) Power and control schematic and wiring diagrams.


(3) Drawings and data showing operation of system.

0


0


0

3


2


3

5


5


5

Before fabrication or procurement

M30

Ventilating system

(Procurement Data)

9.1.1

9.8.1

86-68410

(1) Dimensioned drawings of complete system.


(2) Complete wiring diagrams of the system controls including dimensioned control panel layout and wiring designations and connections.


(3)Bill of Materials.


(4) Manufacturer’s data for testing and adjusting the equipment.

0


0


0


0

3


3


3


3

5


5


5


5

After RSN M29 submittals have been approved but before fabrication or procurement.

M31

Ventilating system

(Final Data)

9.1.1

9.8.1

CE

(1) Test Reports


(2) As Builts


(3) Service Manuals

0


0


0

3


3


3

1


0


0

Prior to final system acceptance

M32

Steel manifold

9.1.1

9.2.1

86-68420

Final drawings

0

1   2   3   4   5   6   7   8   9   ...   58

Похожие:

Block 9 stage 2 – schedules 1 and 4 iconПрежде всего, мы хотели бы поблагодарить Вас за приобретение органа Nord Stage 2! При разработке Nord Stage 2 нашей целью было создание флагманского
Опираясь на успех первой модели Nord Stage, Nord Stage 2 приобрел улучшенные эмуляции электромеханических и акустических клавишных...
Block 9 stage 2 – schedules 1 and 4 iconPart of Term codes: 1 = Full semester; B1 Block 1; B2 Block 2; int = Intersession; irr = Intrasession Short

Block 9 stage 2 – schedules 1 and 4 iconFeasible task schedules with minimum project cost solved by a genetic algorithm michael L. Gargano

Block 9 stage 2 – schedules 1 and 4 iconTeaching block 1, Tuesdays, 2: 00 3: 50, Alberts

Block 9 stage 2 – schedules 1 and 4 iconBlock III book List

Block 9 stage 2 – schedules 1 and 4 iconHere is your Resource Pathfinder for Block’s All School Book

Block 9 stage 2 – schedules 1 and 4 iconUniversiteit Utrecht Block 2-4, 2010-2011

Block 9 stage 2 – schedules 1 and 4 icon1 stage = одноступенчатый

Block 9 stage 2 – schedules 1 and 4 iconOutline of key stage 4 courses

Block 9 stage 2 – schedules 1 and 4 icon2. The Main Course of American History and Its Next Stage

Разместите кнопку на своём сайте:
Библиотека


База данных защищена авторским правом ©lib.znate.ru 2014
обратиться к администрации
Библиотека
Главная страница