C31 | Pipe fittings | 4.2.2 | 86-68140 | Drawings of fittings showing fabrication details | 0 | 3 | 1 | 45 days prior to fabrication | ||
C32 | Pipe shipment | 4.2.1 | CE | Notice that finished pipe units are ready for shipment | 0 | 3 | 1 | 72 hours prior to shipment | ||
C33 | Pipe fittings | 4.2.2 | 86-68140 | Notice that PVC fittings will be tested | 0 | 3 | 1 | 14 days prior to testing fittings | ||
| Reinforced concrete pressure pipe | | | | | | ||||
C34 | Reinforced concrete pressure pipe | 4.3.1 | 86-68180 | Rubber gasket data | 0 | 0 | 4 | At least 40 days prior to procuring pipe | ||
C35 | Fittings for reinforced concrete pressure pipe | 4.3.2 | 86-68140 | Drawing showing fabrication of fittings | 0 | 0 | 2 | At least 40 days prior to fabrication | ||
| Concrete | | | | | | | | ||
C36 | Mix Design | 5.1.3 | CE | (1) Test Data (2) Aggregate Source (3) Aggregate Gradation | 0 | 3 | 0 | At least 30 days before first concrete placement, but not before approval of RSN’s C39 & C40. | ||
C37 | Contractor furnished sampling equipment | 5.2.2 | CE | Drawings and data showing locations and descriptions of sampling equipment | 0 | 3 | 0 | Not less than 30 days prior to start of installation of Contractor's concrete plants | ||
C38 | Cementitious materials | 5.2.3 | CE | (1) Mix Design. (2) Shipping points address. (3) Suppliers. (4) Contractors to whom shippment will be made. (5) Quantities ordered. (6) Shipped in bulk or bags. (7) purchase order number and/or contract number. | 0 | 3 | 0 | At least 30 days before the first shipment of any cementitious materials | ||
C39 | Admixtures | 5.2.4 | CE | (1) Manufacturer and specific brand names of all admixtures to be used (2) Manufacturer product description, instructions, recommended dosage, chloride content, and precautions for use | 0 | 3 | 0 | Prior to use of admixture | ||
C40 | Reinforcing bars | 5.2.13 | CE | Blackline prints of all reinforcement drawings for all structures and bar lists for the following structures: (1) Pumping plant sumps, deck slabs and moss screen bases (2) Elevated tank footings and center pier encasements (3) Unit substation foundations | 0 | 3 | 0 | At least 60 days before scheduled concrete placement | ||
C41 | Reinforcing bars | 5.2.13 | CE | Blackline prints of reinforcement drawings for all structures not listed in RSN C40 | 0 | 3 | 0 | At least 30 days before scheduled concrete placement | ||
C42 | Batching | 5.2.15 | CE | Detailed drawings | 0 | 3 | 0 | 24 hours before batching concrete | ||
C43 | Curing compound | 5.2.19 | CE | Copies of all purchase orders | 1 | 3 | 0 | At least 90 days prior to shipment of curing compounds | ||
C44 | Curing compound | 5.2.19 | CE | Manufacturer's certification | 1 | 3 | 0 | At least 45 days prior to shipment of curing compounds | ||
C45 | Grouting mortar for equipment and metalwork | 5.5.1 | CE | (1) Approval data (2) Instructions | 0 | 3 | 0 | At least 30 days prior to use | ||
| Metal Buildings | | | | | | | |||
C46 | Pre engineered metal building, Plant B0.1R | 6.1.1 | 86-68120 | (1) Approval drawings and data (2) Color chips or charts (3) Certification of building design | 1 1 1 | 3 3 3 | 3 3 2 | At least 45 days before beginning erection of building | ||
C47 | Pre engineered metal building, Plant B0.1R | 6.1.1 | CE | Guarantee for exterior finish | 1 | 3 | 0 | Before completion of work | ||
C48 | Pre engineered metal building, Plant B0.1R | 6.1.1 | CE | Final erection drawings and instructions | 1 | 3 | 0 | At least 14 days before beginning erection of building | ||
C49 | Pre engineered metal building, Plant B0.9L | 6.1.1 | 86-68120 | (1) Approval drawings and data (2) Color chips or charts (3) Certification of building design | 1 1 1 | 3 2 2 | 3 3 2 | At least 45 days before beginning erection of building | ||
C50 | Pre engineered metal building, Plant B0.9L | 6.1.1 | CE | Guarantee for exterior finish | 1 | 3 | 0 | Before completion of work | ||
C51 | Pre engineered metal building, Plant B0.9L | 6.1.1 | CE | Final erection drawings and instructions | 1 | 3 | 0 | At least 14 days before beginning erection of building | ||
C52 | Electrical equipment room | 6.2.1 | 86-68120 | Shop drawings | 0 | 3 | 2 | At least 45 days before beginning erection of building | ||
C53 | Cove base | 6.2.4 | 86-68120 | Sample kits | 0 | 3 | 2 | " " | ||
C54 | Cove base | 6.2.4 | 86-68120 | Approval data | 0 | 3 | 2 | " " | ||
C55 | Cove base | 6.2.4 | CE | Manufacturer's instructions | 0 | 3 | 0 | " " | ||
C56 | Aluminum windows | 6.2.5 | 86-68120 | Drawings and data | 0 | 3 | 2 | " " | ||
C57 | Aluminum windows | 6.2.5 | 86-68120 | Instructions | 0 | 3 | 2 | " " | ||
| Mechanical | | | | | | | | ||
M1 | Steel manifolds | 9.1.1 9.2.1 | 86-68420 | Shop drawings | 0 | 3 | 5 | Before fabrication or procurement | ||
M2 | Sleeve couplings | 9.1.1 9.2.1 9.2.2 | 86-68420 | (1) Commercial products data (2) Installation instructions | 0 | |