Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter




НазваниеUnless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter
страница8/47
Дата09.10.2012
Размер1.91 Mb.
ТипДокументы
1   ...   4   5   6   7   8   9   10   11   ...   47



Florida Building Code Edition 2002

High Velocity Hurricane Zone Uniform Permit Application Form.


Low Slope Roof Area (SF)

_______________________

Steep Sloped Roof Area (SF)

_____________________

Total (SF)

______________________


Section B (Roof Plan)

Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets.






Fill in Specific Roof Assembly Components and Identify Manufacturer

(If a component is not used, identify as “NA”)


System Manufacturer:__________________________


NOA No.:____________________________________


Design Wind Pressures, From RAS 128 or Calculations:


Pmax1:_______ Pmax2:________ Pmax3:________


Max. Design Pressure, From the Specific NOA System:_____________________________________


Deck:

Type:__________________________________


Gauge/Thickness:________________________


Slope:__________________________________


Anchor/Base Sheet & No. of Ply(s):_______________


Anchor/Base Sheet Fastener/Bonding Material:

____________________________________________


Insulation Base Layer:__________________________


Base Insulation Size and Thickness:_______________


Base Insulation Fastener/Bonding Material:

____________________________________________


Top Insulation Layer:___________________________


Top Insulation Size and Thickness:________________


Top Insulation Fastener/Bonding Material:

____________________________________________


Base Sheet(s) & No. of Ply(s):____________________


Base Sheet Fastener/Bonding Material:

____________________________________________


Ply Sheet(s) & No. of Ply(s):______________________


Ply Sheet Fastener/Bonding Material:

____________________________________________


Top Ply:_____________________________________


Top Ply Fastener/ Bonding Material:

____________________________________________


Surfacing:____________________________________


Fastener Spacing for Anchor/Base Sheet Attachment


Field: ____” oc @ Lap, # Rows ____ @ ____” oc


Perimeter: ____” oc @ Lap, # Rows ___ @ ____” oc


Corner: ____” oc @ Lap, # Rows ____ @ ____” oc


Number of Fasteners Per Insulation Board


Field _____ Perimeter _____Corner _____


Illustrate Components Noted and Details as Applicable:

Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counter- Flashing, Coping, Etc.

Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.


FT.





.


FT.






Florida Building Code Edition 2002

High Velocity Hurricane Zone Uniform Permit Application Form.


Section D (Steep Sloped Roof System)



Roof System Manufacturer:__________________________________


Product Control Approval Number:_______________________________


Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations):


P1:__________ P2:__________ P3:___________


Maximum Design Pressure

(From the NOA Specific System):________________


Method of tile attachment:_____________________________________________




Steep Sloped Roof System Description

Deck Type: ______________________

Type Underlayment:

Insulation:

Fire Barrier:

Fastener Type & Spacing:

Adhesive Type:

Type Cap Sheet:

Type Roof Covering:

Type & Size Drip

Edge:
1   ...   4   5   6   7   8   9   10   11   ...   47

Похожие:

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconThis is not an official, verbatim transcript of the following meeting. It should be used for informational purposes only. This document has not been edited; therefore, there may be additions, deletions, or words that did not translate

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconThis is not an official, verbatim transcript of the following meeting. It should be used for informational purposes only. This document has not been edited; therefore, there may be additions, deletions, or words that did not translate

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconKey Words: Peer tutoring, wiki, sample code database, knowledge production, e-learning

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconMaine Revised Statute Title 10, Chapter 1103: maine uniform building and energy code

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconЮ. Муравьев Истина. Культура. Идеал
Родины – коммунизма – Культуры – Духовности – Истины»! Самая непереносимая вещь – скучная истерика. Истина, культура, идеал. Words,...
Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter icon2 Terms, definitions and abbreviated terms 14

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter icon1. 2 In the context of the Eleventh Five Year Plan (2007-2012), Planning Commission set up a Working Group on Fertilizers Industry under the Chairmanship of Secretary (fertilizers) with its Terms of Reference and composition indicated below: 3 terms of reference

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconUcas or Other Admissions Code Northumbria Programme Code

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconUcas or Other Admissions Code Northumbria Programme Code

Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter iconUcas or Other Admissions Code Northumbria Programme Code

Разместите кнопку на своём сайте:
Библиотека


База данных защищена авторским правом ©lib.znate.ru 2014
обратиться к администрации
Библиотека
Главная страница