SECTION C


SPECIAL PROVISIONS


SECTION C


SPECIAL PROVISIONS


TABLE OF CONTENTS


SPECIAL PROVISIONS 1

SPECIAL PROVISIONS 1

SECTION 1. SPECIFICATIONS AND PLANS 1

SECTION 1. SPECIFICATIONS AND PLANS 1

AMENDMENTS TO JULY 2002 STANDARD SPECIFICATIONS 1

AMENDMENTS TO JULY 2002 STANDARD SPECIFICATIONS 1

90 6.01   GENERAL 22

1-1 ABBREVIATIONS 33

1-2 DEFINITIONS 33

SECTION 2 - PROPOSAL REQUIREMENTS AND CONDITIONS 35

SECTION 2 - PROPOSAL REQUIREMENTS AND CONDITIONS 35

2-1 CONTENTS OF PROPOSAL FORMS 35

2-2 EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK 35

2-3 PROPOSAL FORMS 35

2-4 MATERIAL GUARANTY 35

SECTION 3 - AWARD AND EXECUTION OF CONTRACT 35

SECTION 3 - AWARD AND EXECUTION OF CONTRACT 35

3-1 AWARD OF CONTRACT 35

3-2 CONTRACT BONDS 36

3-3 EXECUTION OF CONTRACT 36

3-4 RETURN OF PROPOSAL GUARANTIES 36

SECTION 4.  BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES 36

SECTION 4.  BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES 36

SECTION 5.  GENERAL 37

SECTION 5.  GENERAL 37

5 1. MISCELLANEOUS 37

5 1.012 DIFFERING SITE CONDITIONS 37

5 1.02 LABOR NONDISCRIMINATION 37

5-1.023 INDEMNIFICATION AND INSURANCE 38

5 1.027 PAYMENT OF WITHHELD FUNDS 40

5 1.03 INTEREST ON PAYMENTS 40

5 1.031 FINAL PAYMENT AND CLAIMS 41

5 1.04 PUBLIC SAFETY 41

5 1.05 SURFACE MINING AND RECLAMATION ACT 41

5 1.06 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES 42

5 1.07 SUBCONTRACTING 42

5 1.08 PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS 42

5 1.09 PAYMENTS 42

5 1.10 SOUND CONTROL REQUIREMENTS 43

5 1.11 PROJECT APPEARANCE 43

5 1.12 PRESERVATION OF PROPERTY 44

5-1.13 PRE-CONSTRUCTION CONFERENCE 45

5-1.14 SHOP DRAWINGS AND SUBMITTALS 45

5 1.15 COORDINATION AND INTERPRETATION OF PLANS, STANDARD SPECIFICATIONS, AND SPECIAL PROVISIONS 46

5-1.16 SUPERINTENDENCE 46

5-1.17 INSPECTION 46

5-1.18 RETENTION OF DEFECTIVE WORK 46

5-1.19 COMPACTION TESTS 46

5-1.20 RECORD DRAWINGS 47

5 1.21 SUGGESTIONS TO CONTRACTOR 47

5-1.22 MANUFACTURER'S RECOMMENDATIONS 47

5-1.23 LABORATORY MAXIMUM DENSITY 47

5-1.24 FIELD DENSITY 47

5-1.25 POLICY ON DRUGS AND ALCOHOL 47

5-1.26 INJURY AND ILLNESS PREVENTION PROGRAM 47

5-1.27 PERMITS AND LICENSES 48

5-1.271 GENERAL PERMIT TO DISCHARGE STORM WATER 49

5-1.28 STANDARD NOTIFICATIONS 49

5-1.29 DRAINAGE CONTROL 50

5-1.30 NON-COMPLYING WORK 50

5-1.31 NO WAIVER OF LEGAL RIGHTS 50

5-1.32 EXTRA WORK 51

5-1.33 DISPUTED WORK 51

5-1.34 CHANGES REQUESTED BY THE CONTRACTOR 51

5-1.35 WEEKLY CONSTRUCTION MEETINGS 51

5-1.36 TEMPORARY SUSPENSION OF WORK 51

5-1.37 HOLIDAYS 51

5-1.38 WORKING HOURS 51

5-1.39 FINAL JOB WALKTHROUGH MEETING 52

5-1.40 DEFAULT BY CONTRACTOR 52

5-1.41 RECORDS 52

5 1.42 AREAS FOR CONTRACTOR'S USE 52

5 1.43 COST REDUCTION INCENTIVE 52

SECTION 8.  MATERIALS 52

SECTION 8.  MATERIALS 52

8-1. MISCELLANEOUS 53

8 1.01 GENERAL 53

8 1.02 PREQUALIFIED AND TESTED SIGNING AND DELINEATION MATERIALS 53

PAVEMENT MARKERS, PERMANENT TYPE 53

PAVEMENT MARKERS, TEMPORARY TYPE 54

STRIPING AND PAVEMENT MARKING MATERIAL 54

CLASS 1 DELINEATORS 55

CHANNELIZERS 55

OBJECT MARKERS 56

CONCRETE BARRIER MARKERS AND 56

TEMPORARY RAILING (TYPE K) REFLECTORS 56

8 1.03 ENGINEERING FABRICS 58

SECTION 8-2. CONCRETE 59

SECTION 8-2. CONCRETE 59

8 2.1 PORTLAND CEMENT CONCRETE 59

SECTION 8-3.  WELDING 60

SECTION 8-3.  WELDING 60

8 3.1 WELDING 60

GENERAL 60

WELDING QUALITY CONTROL 62

STEEL PIPE PILING QUALIFICATION AUDIT 65

66

66

SECTION 9.  DESCRIPTION OF WORK 66

SECTION 9.  DESCRIPTION OF WORK 66

SECTION 10.  CONSTRUCTION DETAILS 66

SECTION 10.  CONSTRUCTION DETAILS 66

10-1.  GENERAL 66

10 1.01 ORDER OF WORK 66

PROJECT PHASING 66

10 1.02 WATER POLLUTION CONTROL 67

RETENTION OF FUNDS 68

STORM WATER POLLUTION PREVENTION PLAN PREPARATION, APPROVAL AND AMENDMENTS 68

SWPPP IMPLEMENTATION 69

YEAR ROUND IMPLEMENTATION REQUIREMENTS 70

RAINY SEASON IMPLEMENTATION REQUIREMENTS 70

NON-RAINY SEASON IMPLEMENTATION REQUIREMENTS 70

MAINTENANCE 70

REPORTING REQUIREMENTS 71

REPORT OF DISCHARGES, NOTICES OR ORDERS 71

REPORT OF FIRST TIME NON-STORM WATER DISCHARGE 71

ANNUAL CERTIFICATIONS 71

SAMPLING AND ANALYTICAL REQUIREMENTS 71

PAYMENT 73

10-1.03 PROGRESS SCHEDULE 73

10 1.04 OBSTRUCTIONS 74

10 1.05 COOPERATION 75

10-1.06 FIELD OFFICE FACILITIES 75

10 1.07 DUST CONTROL 76

10 1.08 AIR POLLUTION CONTROL 76

10 1.09 MOBILIZATION 77

10-1.10 FLAGGING COSTS 77

10 1.11 CONSTRUCTION PROJECT INFORMATION SIGNS 77

10 1.12 CONSTRUCTION AREA SIGNS 78

10-1.13 TRAFFIC CONTROL 78

TRAFFIC CONTROL REQUIREMENTS AND CONDITIONS 79

10 1.14 EXISTING FACILITIES 81

10-1.141 STRUCTURE REMOVAL 82

82

10-1.142 REMOVE AND REPLACE ROAD SIGNS 82

10-1.15 CLEARING AND GRUBBING 82

10 1.16 EARTHWORK 83

10-1.161 TEMPORARY EXCAVATION SUPPORT 84

10-1.162 DEWATERING 85

10-1.163 ADDITIONAL SUBGRADE OVEREXCAVATION 85

10 1.17 AGGREGATE BASE 86

10 1.18 REMOVE AC PAVEMENT 86

10-1.19 REPLACE AC PAVEMENT 87

10-1.20 REMOVE CONCRETE CURB AND GUTTER 89

10-1.21 REPLACE CURB & GUTTER 90

10-1.22 REMOVE PCC PAVEMENT 90

10-1.23 REPLACE PCC PAVEMENT 91

10 1.24 CONCRETE STRUCTURES 91

10-1.241 CONCRETE PLACEMENT METHOD 92

10-1.242 FORMS 92

10-1.243 TOLERANCES AND SURFACE FINISHES 92

10-1.244 MINOR STRUCTURES 93

10-1.25 REINFORCEMENT 94

10 1.26 PLASTIC PIPE 95

95

10 1.27 REINFORCED CONCRETE PIPE 95

10 1.28 MISCELLANEOUS IRON AND STEEL 96

10-1.281 INSTALL PIPE HANGERS 96

10-1.282 FLAP GATE 96

10-1.283 BULKHEAD 97

10-1.284 DEBRIS RACK 97

10 1.29 PAINT TRAFFIC STRIPE AND PAVEMENT MARKING 97

10 1.30 WATER FOR CONSTRUCTION 98

10 1.31 WATER RELOCATION 98

10-1.311 REMOVE AND REPLACE WATER MAIN 99

10-1.312 LANDSCAPE IRRIGATION 99

10-1.32 SUBDRAIN SYSTEM 99

10-1.33 CHAIN LINK FENCE / RAILING 100

10-1.34 LIGHTING RECONSTRUCTION 100

107

This SSP will be inserted in the boilerplate during the MERGE.

The contract no. is taken from data entered in the merge document & is also inserted during the MERGE.

SANTA BARBARA COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT


  1   2   3   4   5   6   7   8   9   ...   47

Похожие:

Section specifications and plans 1 iconSection specifications and plans

Section specifications and plans 1 icon75 01 general 75 01a summary Section 75 includes specifications for fabricating and installing miscellaneous metal materials. 75 01b quality Control and Assurance

Section specifications and plans 1 iconSection-a english Literature from Chaucer to 1900 (covering trends, movements, major authors and texts) Section-B

Section specifications and plans 1 iconA fruitful year of 2010 has been experienced by ieee taipei Section. Efforts have been made to elevate the section to the next level. The membership count is

Section specifications and plans 1 iconNote to Specifier: Revise this specification section to suit project requirements. This specification section includes the use of mechanical deck fasteners and

Section specifications and plans 1 iconNote for Philip: Each section of the content is preceded by the columned table, copied over from your original document. The main body text for each section is outside of the table

Section specifications and plans 1 iconDuration of Plans

Section specifications and plans 1 iconArticle 4: Guidelines for Plans and Forms 35

Section specifications and plans 1 iconG3 Plans, Information Operations Branch

Section specifications and plans 1 iconTetra Pak outlines environmental plans

Разместите кнопку на своём сайте:
Библиотека


База данных защищена авторским правом ©lib.znate.ru 2014
обратиться к администрации
Библиотека
Главная страница